Technical Reports
Certain reports, those in PDF format, are available to download at no charge. To order hard copies and bound reports, visit the Contact Us Page.
- T25-01 State of Transportation 2024 Final (PDF)
- T25-03 Hampton Roads Congestion Management Process - Part I (PDF)
- T25-04 Hampton Roads Regional Bridge Study - 2025 Update (PDF)
- T25-05 Hampton Roads Regional Freight Study - 2025 Update (PDF)
- T25-06 HRTPO Annual Roadway Performance Report 2025 (PDF)
- T25-07 Suffolk Train Station Report (PDF)
- T25-08 CMAQ-RSTP PSP 2024 Report (PDF)
- T24-01 Annual State of Transportation in Hampton Roads Report (PDF)
- T24-02 Hampton Roads Regional Safety Study 2023 (PDF)
- T24-03 HRTPO FY 2025 UPWP (PDF)
- T24-04 HRTPO Annual Roadway Performance Report 2024 (PDF)
- 2023 CMAQ-RSTP PSP Report FINAL w Cover (PDF)
- Regional Performance Measures 2024 - Final Report (PDF)
- Hampton Roads Amended 2045 Long-Range Transportation Plan and Fiscal Year 2024 to 2027 Transportation Improvement Program (PDF)
- HR RCA 2045LRTP Fiscal Year 2024 to 2027 TIP (PDF)
- T23-02 State of Transportation in Hampton Roads 2022 (PDF)
- T23-03 HR IACC Procedures (PDF)
- T23-04 Hampton Roads Congestion Management Process (PDF)
- T23-08 Extending the Elizabeth River Trail- Cost Model and Cost Estimates (PDF)
- T23-09 2022 CMAQ-RSTP PSP Report (PDF)
- T23-10 Improving Hampton Roads Passenger Rail (PDF)
- T23-11 Regional Performance Measures Report (PDF)
- Rural LRTP (PDF)
- T22-01 The State of Transportation in Hampton Roads 2021 (PDF)
- T22-02 HRTPO Level of Traffic Stress Hampton (PDF)
- T22-03 Funding of Upgrading Private Roads to VDOT System (PDF)
- T22-04 HRTPO Unified Planning Work Program FY2023 (PDF)
- T22-06 Regional Performance Measures - System Performance Report 2022 (PDF)
- T22-07 2021 CMAQ-RSTP Project Selection Process Report Final (PDF)
- T22-08 Planning Deployment of Zero-Emission Bus for Williamsburg Area Transit Authority (WATA) (PDF)
- T22-09 Potential Criteria for Requiring Traffic Impact Analyses - a Review of Current Practices (PDF)
- T22-10 HRTPO Annual Roadway Performance Report (PDF)
- T22-11 HR Regional Trails Report (PDF)
- T23-09 2022 CMAQ-RSTP PSP Report (PDF)
- Candidate Project Evaluation and Prioritization Report (PDF)
- Funding Plan (PDF)
- HR RCA 2045LRTP Fiscal Year 2021 to 2024TIP (PDF)
- Plan Performance (PDF)
- Project Information Guide (PDF)
- Public Involvement Documentation (PDF)
- Regional Vision Plan (PDF)
- T21-01 Hampton Boulevard Corridor Study (PDF)
- T21-03 State of Transportation 2020 - Final Report TPO Board (PDF)
- T21-04 Disadvantage Business Enterprise Program 2020-2024 (PDF)
- T21-08 Regional Performance Measures - System Performance Report 2021 (PDF)
- T21-12 Drive Thru Queue Stacking Requirements in Virginia Cities - Final Report (PDF)
- T21-13 HRTPO Hampton Roads CMAQ-RSTP Project Selection Process-2020 (PDF)
- T21-14 Gloucester County Transportation Study (PDF)
- T21-15 HRTPO Annual Roadway Performance Report 2021 Edition (PDF)
- COVID-19 Transportation version 3 (PDF)
- Fiscal Year 2020 TRAFFIX Annual Report DRAFT (PDF)
- Regional Needs (PDF)
- T20-01 052120 07H-Enclosure CMP 2020 Report Part I (PDF)
- T20-02 Linking Hampton Roads-A Regional Active Transportation Plan (PDF)
- T20-04 052120 07L-Enclosure Fiscal Year 2020 UPWP Extension (PDF)
- T20-05 Economic Impact of Bicycle Facilities- Phase Two (PDF)
- T20-06 - Historic Triangle Comprehensive Transportation Study (PDF)
- T20-09 Regional Performance Measures - System Performance Report 2020 (PDF)
- T20-11 HRTPO 2019 Congestion Mitigation and Air Quality Improvement Program (PDF)
- T20-12 101520 11G Enclosure Consent - CMP Part 2 - System Performance Report Final (PDF)
- T20-14 HRTPO Unified Planning Work Program (UPWP) FY2021 (PDF)
- T20-16 Impact of Trails and Sidewalks on Home Values (PDF)
- Title VI/EJ Candidate Project Evaluation (PDF)
- Transportation Challenges and Strategies (PDF)
- 2018 CMAQ-RSTP PSP Report - Final April 2, 2019 (PDF)
- Fiscal Year 2018 TRAFFIX Annual Report (PDF)
- Fiscal Year 2019 TRAFFIX Annual Report (PDF)
- Socioeconomic Forecast and TAZ Allocation (PDF)
- T18-12 Economic Impact of Bicycle Facilities in Hampton Roads- Phase One (PDF)
- T19-03 Enclosure Regional Performance Measures - System Performance Report Final (PDF)
- T19-05 Southampton County Active Transportation Plan (PDF)
- T19-06 HRTPO FY2020 Unified Planning Work Program (PDF)
- T19-07 Guide for Adding Historical Markers to the Birthplace of America Trail (PDF)
- T19-08 HRTPO Public Participation Plan (PDF)
- T19-09 Isle of Wight County Transportation Study (PDF)
- T19-10 State of Transportation 2019 - Final Report (PDF)
- T19-12 Impact of HOT Lane Operations- Lessons from I-64 Reversible Lanes (PDF)
- Fiscal Year 2017 TRAFFIX Annual Report (PDF)
- Fiscal Year 2018 Annual Obligation Report (PDF)
- RCA HR 2040 LRTP and Fiscal Year 2018 to 2021 TIP - Final Report (2018-8-29) (PDF)
- T18-01 031518 E13 - Highway Gateways Used by Port Trucks (PDF)
- T18-02 HRTPO PPP (PDF)
- T18-03 HRTPO FY2019 UPWP - Final (PDF)
- T18-04 Candidate Segments for Road Diets (PDF)
- T18-05 21J Enclosure HR Regional Bridge Study FINAL Report 05-17-18 (PDF)
- T18-06 21M Enclosure 2017 CMAQ-RSTP PSP Report - Final 05-17-18 (PDF)
- T18-07 071918 13 Enclosure - Military Trans Needs Study - 2018 Update FINAL (1) (PDF)
- T18-08 071918 19K Enclosure - Roadway Performance Measures 2018 - FINAL (PDF)
- T18-09 071918 19L Enclosure - HamptonRoads-2015-SocioeconomicData-by-TAZ (PDF)
- T18-10 State of Transportation 2018 - Final Report (PDF)
- T19-08 PPP(web upload) (PDF)
- Fiscal Year 2016 TRAFFIX Annual Report - final March 3, 2017.pdf (PDF)
- T16-05 2040LRTP Project Information Guide (New) (PDF)
- T17-01 011917TPO-E18N-CMP Volumes and Speeds 2015 Final Report.pdf (PDF)
- T17-02 Regional Transit Benchmarking Study Study Final Report.pdf (PDF)
- T17-04 HRTPO FY2018 UPWP - Final rev 9-21-17.pdf (PDF)
- T17-06 HRTPO Self-Certification Procedural Guide 042017.pdf (PDF)
- T17-07 2016 CMAQ-RSTP PSP Report - Final1.pdf (PDF)
- T17-08 Regional Freight Study Update 2017 Update - FINAL(new).pdf (PDF)
- T17-09 Moving the Economy (PDF)
- T17-11 HR-2040-RLRTP.pdf (PDF)
- T17-12 Roadway Performance Measures 2017 - FINAL.pdf (PDF)
- T17-13 One-Way Two-Way Report (with Spreadsheet) (PDF)
- T17-15 State of Transportation 2017 - Final Report.pdf (PDF)
- Fiscal Year 2015 Traffix Annual Report (PDF)
- HRTO-Operations Strategy Final Report May 2016 (1) (PDF)
- T15-14 Promising Intersections for High-Benefit/Low-Cost Improvements (PDF)
- T16-01 CMAQ-RSTP 2015 PSP Report - Final (PDF)
- T16-02 Signature Paths T16-02 (PDF)
- T16-03 HRTPO Fiscal Year 2017 UPWP (PDF)
- T16-03a Sea Level Rise-Storm Surge Impacts to Roadways in HR Final Report (PDF)
- T16-06 2040LRTP PlanPerformance (PDF)
- T16-07 2040LRTP PublicInvolvement (PDF)
- T16-08 State of Transportation 2016 Final Report (PDF)
- T16-09 RPM Final Report with Cover Back (PDF)
- Hampton Roads High Speed Passenger Rail Vision Plan - Appendices (PDF)
- Hampton Roads High Speed Passenger Rail Vision Plan - Exec. Summary (PDF)
- Hampton Roads High Speed Passenger Rail Vision Plan - Final Report (PDF)
- HRTPO Guidance on HB2 (PDF)
- T15-01 2014 Traffix Annual Report (PDF)
- T15-01 HRTPO 2040LRTP ProjectPrioritization FinalReport (PDF)
- T15-02 2014 CMAQ-RSTP PSP Report - Final (PDF)
- T15-03 101515TPO-Enclosure 12-Hampton Roads 2040 LRTP-Candidate Project Evaluation Title VI-Environmental J (PDF)
- T15-04 Fiscal Yera 2016 HRTPO UPWP (PDF)
- T15-05 TRB Paper Analyzing the Impact of Implementing New Tolls on Existing Roadway Facilities Revised (PDF)
- T15-05 E13F - Impact of Tolls at MTT-DTT - FINAL Report (PDF)
- T15-05 South Hampton Roads Midtown and Downtown Tolls Survey-Part 1 (PDF)
- T15-05 South Hampton Roads Midtown and Downtown Tunnels Tolls Survey-Part II (PDF)
- T15-06 Truck Delay Impacts of Key Planned Hwy Projects Final Report (PDF)
- T15-07 E17I - Challenges and Strategies FINAL Report (PDF)
- T15-08 Mode Choices of Millennials (PDF)
- T15-09 HRTPO RPMs Final Report (w new inside cover) (PDF)
- T15-12 State of Transportation 2015 Final Report (PDF)
- T15-13 CMP Volumes and Speeds 2014 - Final Report (PDF)
- 2014 Traffix Annual Report (PDF)
- Fiscal Year 2013 TRAFFIX Annual Report - final (PDF)
- T14-01 Prioritizing Highway Projects for Improvement of Hurricane Evacuation (PDF)
- T14-02 Regional Procedures for Planned Closures at River Crossings (PDF)
- T14-03 Positioning HR for Freight Infrastructure Funding - Final Report (PDF)
- T14-04 Fiscal Year 2015 HRTPO UPWP (PDF)
- T14-06 State of Transportation 2014 Final Report (PDF)
- T14-07 Pavement Performance Measurement in HR (PDF)
- T14-08 HR Regional Safety Study 2013-2014 PART II Final Report (PDF)
- T14-10 2040LRTP Committed and Candidate Transportation Projects (PDF)
- T14-11 091814TPO-A14F-HRTPO Performance Management Process Including Fiscal Year 14 Update of Regional Performance Me (PDF)
- T14-12 CMP Report Appendices Updated Final Version (PDF)
- T14-12 CMP Report Final Version (PDF)
- Fiscal Year 2012 TRAFFIX Annual Report (PDF)
- T12-02 Final 2034LRTP (PDF)
- T13-02 Fiscal Year 2012 TRAFFIX Annual Report (PDF)
- T13-02 Fiscal Year 2014 HRTPO UPWP revised 11-26-13 (PDF)
- T13-03 071813TPO-Enclosure 14K-HRTPO Title VI and LEP Plan - Updated May 2013 (PDF)
- T13-04 Roadways Serving the Military and Sea Level Rise-Storm Surge Report (PDF)
- T13-05 State of Transportation 2013 Final Report (PDF)
- T13-06 Volumes Speeds and Congestion Final Report (PDF)
- T13-07 Travel Time Reliability Study Final Report (PDF)
- T13-08 CTBPresentation (ZIP)
- T13-08 Existing and Future Truck Delay in HR Final Report (PDF)
- T13-09 2040 Long-Range Trans Plan-Visioning Survey Report (PDF)
- T13-09 2040 LRTP-Visioning Survey Report-Appendices (PDF)
- T13-10 HR 2040 SocioeconomicForecast TAZAllocation FinalReport (PDF)
- T13-11 HR Regional Safety Study 2013 PART I Final Report (PDF)
- EXEC SUMMARY RCA HR 2030 LRTP Fiscal Year 09-12 TIP (PDF)
- RCA HR 2030 LRTP Fiscal Year 09-12 TIP (PDF)
- T12-01 2011 CMAQ-RSTP PSP Report - Final.pdf (PDF)
- T12-03 E10 - JCC WMB YC Final Report.pdf (PDF)
- T12-04 E11 - Travel Time Study Final Report.pdf (PDF)
- T12-05 Fiscal Year 2013 HRTPO UPWP - Approved 041912 (PDF)
- T12-06 RPM- full document (PDF)
- T12-07 E14 State of Transportation 2012 Final Report (PDF)
- T12-08 Regional Active Transportation Scan (PDF)
- T12-09 Traffix Annual Report Fiscal Year 2012 (PDF)
- T12-10 Users of Existing Toll Facilities in Hampton Roads (PDF)
- T12-11 Military Commuter Survey 2012 FINAL Report (PDF)
- T12-12 Hampton Roads Regional Freight Study 2012 Update (PDF)
- T12-13 HRTPO Public Participation Plan (PDF)
- T12-14 Hampton Roads Regional Bridge Study 20212 Update (PDF)
- Transportation Conformity Analysis (PDF)
- Exec Summary RCA HR 2034 LRTP and Fiscal Year 2012 to 2015 TIP (PDF)
- RCA HR 2034 LRTP and Fiscal Year 2012 to 2015 TIP (PDF)
- T11-01 Project Info Sheets for Plan 061711 (PDF)
- T11-02 Hampton Roads Regional Land Use Map Report (PDF)
- T11-07 Inland Port Facility Final Report (PDF)
- T11-08 E12 - General Crash Data and Trends 2011 Final Report (PDF)
- T10-01 General Crash Data and Trends 2010 Final Report (PDF)
- T10-03 CMAQ-RSTP PSP Fiscal Year 11-15 Final Report (PDF)
- T10-05 CNU Focus Group Final Report (PDF)
- T10-05 Reg Land Use Research Scan Final Report (PDF)
- T10-07 CMP Final Report TPO (PDF)
- T10-07 HRTPO Program Priorities Methodology Final ReportAppendix (PDF)
- T10-07 ProgramPrioritiesMethodologyReport (PDF)
- T10-08 2030LRTP amend Summary (PDF)
- T10-08 E06 - Socioeconomic Final Report (PDF)
- T10-09 Appendix E Dec10 TPO Board (PDF)
- T10-09 E10A Prioritization Report (PDF)
- T10-10 E10 - State of Trans 2010 Final Report (PDF)
- Urban Crescent Materials (PDF)
- Final Hampton Roads Cert. Report Combined (PDF)
- Jordan Bridge Report 09 08 (PDF)
- T08-01 Oyster Point Transportation Study (PDF)
- T08-03 2000 2034 TAZ Data (XLS)
- T08-03 TAZ2000to2034 (PDF)
- T08-04 Transit Shuttle Project Literature Review Best Practices (PDF)
- T08-06 RCTOExecSummFinalCopy (PDF)
- T08-06 RegionalBridgeStudyFinalReport (PDF)
- T08-07 ERCS final August 26, 2008 (PDF)
- T08-08 LocationOfNon-DriversInHR (PDF)
- T08-10 Delay Study Final (PDF)
- T07-01 Regional Travel Time 3-2007 Final (PDF)
- T07-02 IMS2007 Final Report reduced (PDF)
- T07-03 SuffolkRailReport (PDF)
- T07-03 SuffolkTechAppx (PDF)
- T07-04 NAS Norfolk Final Report for website (PDF)
- T07-05 Non-Driver Snapshot (PDF)
- T07-06 Improving the Mobility of Non-Drivers (PDF)
- T07-07 RLRP Phase One (PDF)
- T07-08 Neighborhood Gaps Analysis (PDF)
- T07-09 Transportation Participation Plan (PDF)
- T07-10 2030LRP Technical Document (PDF)
- T07-10 2030LRP Technical Document Appendices (PDF)
- T07-10 Reg Significant Projects 2030LRP (PDF)
- T07-11 Gen Crash Data Trends 07 Final (PDF)
- T06-01 Final Toll Study Addendum (PDF)
- T06-01 Final Toll Study Appendices (PDF)
- T06-01 Final Toll Study Report (PDF)
- T06-01 Rural Safety Study Final Report (PDF)
- T06-02 General Crash Data and Trends Final Report (PDF)
- T06-03 Final Local Transportation Infrastructure Financing methods Research Study (PDF)
- T06-04 1. Travel Time Introduction (PDF)
- T06-04 2. Travel Time Thoroughfare List (PDF)
- T06-04 3. Travel Time Report Documentation (PDF)
- T06-04 4. Travel Time Contact Information (PDF)
- T06-06 CMAQ-RSTPReport-07-10 (PDF)
- T06-07 18-64 Non-Driver Report (PDF)
- T06-08 State of Trans Update Final Report (PDF)
- T04-01 NEW 2030TAZ FINAL (PDF)
- T04-02 Regional Safety Study Final Report Part 3 (PDF)
- T04-03 Livable Streets Initiative (PDF)
- T04-04 2026 Plan.ppt (PDF)
- T04-04 HR Strategic Plan 2004 (PDF)
- T04-05 Greenbrier Pedestrian Study Final Report (PDF)
- T04-06 Wythe Creek Carys Chapel Report (PDF)
- T04-07A 2026RTPtechdoc (PDF)
- T04-07B 2026TechDocappend (PDF)
- T04-08 MidtownTunnelClosing (PDF)
- T04-09 PIP Evaluation 6-2004 (PDF)
- T04-12 CMS Part I Final Report (PDF)